For Hong Kong new home inspections, the most important steps are: upon receiving the handover notice from the developer, arrange an inspection as soon as possible, document all defects item by item, submit a written defect list, and conduct a follow-up inspection after repairs are completed. Inspections can generally be carried out by the homeowner or by a professional inspector. Actual deadlines and procedures are subject to the sale and purchase agreement, the sales brochure, and the developer's notice.
The handover notice and the developer's inspection / defect record form.
Sales and purchase agreement, sales brochure, unit floor plan, and specifications.
Details of equipment, finishing materials, and brands promised by the developer.
Your identity document; if attended by a representative, bring a letter of authorization and relevant documents.
Mobile phone or camera — preferably with date and time stamping enabled.
High-powered flashlight.
Measuring tape or laser distance meter.
Spirit level.
Socket tester or mobile phone charger.
A small amount of water, for testing drainage.
A ping-pong ball, for roughly testing floor gradient.
Paper, pen, tape or sticky labels, for marking problem areas.
For professional inspections, hollow-sounding hammers, moisture meters, and other testing instruments may be used. Generally, allow 1 to 2 hours for a standard unit; larger units or those with more issues may require additional time.
Inspect the working platform, balcony, and windowsill.
Check for signs of water seepage on exterior walls, window edges, bathrooms, and kitchens.
Verify that the false ceiling access panel can be opened.
Inspect the air conditioning unit platform, pipes, and drainage points.
Confirm there is no construction debris, broken glass, or sharp objects left inside the unit.
If a parking space or storage room is included, verify the location, dimensions, and fittings separately.
First, confirm the unit details and inspection checklist form.
Follow the floor plan and sales brochure, and inspect each room one by one.
Start with appearance and dimensions, then test water, electricity, doors, windows, and fittings.
For each issue found, record the exact location, nature of the defect, and the corresponding photo reference number.
Request the developer's representative to acknowledge receipt by signing the defect list.
Retain copies of all submitted checklists, photos, emails, and repair records.
Arrange a follow-up inspection after the developer completes the rectification works — do not accept verbal confirmation by phone only. It is generally understood that defect rectification for new residential properties is commonly completed within approximately six months from the handover date, though this may vary by project. Always refer to your contract and the developer's written notice rather than relying on general practice.
Common issues in new homes include hollow floor tiles, stiff or misaligned doors and windows, slow drainage, pipe leaks, paint defects, and non-functioning fixtures.
Before the developer completes the defect rectification, document and report all issues first. Making your own replacements, drilling walls, or renovating may make it harder to establish liability later.
Issues such as severe water seepage, electrical faults, windows that cannot be locked, structural cracks, or malfunctioning safety equipment should not be recorded merely as minor cosmetic defects.
If you are unfamiliar with building, electrical, and drainage inspections, or if the unit is large, hiring an independent inspector is advisable. Confirm the scope of the report, whether follow-up inspections are included, and the fees involved.
A standard inspection mainly checks for visible defects and basic functionality. For structural safety, unauthorized works, water seepage liability, or contractual disputes, you should engage a registered professional or seek legal advice separately.